Draft Annual Plan 1978-79 Himachal Pradesh

dc.contributor.authorPlanning Commission
dc.date.accessioned2023-12-14T09:51:31Z
dc.date.available2023-12-14T09:51:31Z
dc.date.issued1978
dc.description.abstractThe Fifth Plan (1974-75 to 1978-79) was launched in a very optimistic atmosphere on 1st April, 1974. At 1972-73 price levels the size of the Fifth Plan was put around double the size of the Fourth Plan. The total fourth Plan expenditure was Rs. 113.43 crores and the draft Fifth Plan size was envisaged at Rs. 231.40 crores. Later on, when the National Development Council met in September, 1976 to finalize the Fifth Plan, the size of Himachal’s Fifth Plan was fixed at Rs. 238.95 crores. In fact the Fifth Plan did not have a good start in the face of highest ever price hike and mounting inflationary pressures as a result of which the flow of funds during first two years of the Fifth Plan was much less as compared to the proportionate norms. the total plan outlays for 1974-75 and 1975-76 were Rs. 30.66 crores and Rs. 32.58 crores against which an expenditure of Rs. 30.80 crores and Rs. 33.02 crores, respectively, was recorded.
dc.identifier.citationPlanning Commission - 1978
dc.identifier.issn126242
dc.identifier.urihttp://10.21.131.211/handle/123456789/1966
dc.identifier.urihttp://10.21.131.211:8080/eBook/126242/index.html
dc.language.isoen
dc.publisherPlanning Commission
dc.relation.ispartofseriesD-4-24-C-2184; D-4-24
dc.titleDraft Annual Plan 1978-79 Himachal Pradesh
dc.title.alternativePlanning Department, Himachal Pradesh
dc.typeBook

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Draft_Annual_Plan_1978-79.pdf
Size:
7.68 MB
Format:
Adobe Portable Document Format

Collections